INTRODUCTION:
The Alero City Project at Lekki Free Trade Zone involved the development of a smart city with residential buildings and industries. The client required an Independent Network (IDN) for a reliable, available, and trusted power supply, distinct from the regular disco setup.
CLIENT PROBLEM:
The client needed a dedicated power solution with reliability and independence from the regular disco setup.
RECOMMENDED SOLUTIONS:
Conduct a power needs analysis, obtain the necessary licenses for an Independent Network, and proceed with the project phases.
IMPLEMENTED SOLUTIONS:
After conducting a power needs analysis, the project obtained the required license, and Phase One was successfully completed, establishing a reliable and independent power supply for Alero City.
PROJECT IN PICTURES


